All projects
HVAC APPLICATION · PROCESS IMPROVEMENT
Manual VRF Selection & BOQ Tool
VRF selection workbook covering system selection, calculations, accessories, Y-Joints, BOQ preparation, and pricing outputs.
Engineering challenge
VRF system selection covered multiple connected steps — system selection, cooling requirement calculation, product options, Y-Joints, accessories, and BOQ preparation.
Approach
Developed a manual VRF selection workbook covering system selection, cooling requirement calculation, product options, Y-Joints, accessories, BOQ preparation, and pricing-ready output.
My contribution
Application engineering — tool design and development.
Result
Structured VRF selections with BOQ and pricing-ready outputs generated from the same workbook.
Verified impact
VRF selections with BOQ and pricing-ready outputs